Startup Checklist & Log; Model Number; Serial Number - Trane EXWA Installation Manual

Water-to-water water-source heat pump
Table of Contents

Advertisement

Installing Contractor:
start-up. (This form need not be returned to the factory unless requested during technical service support).
Job Name:

Model Number:

Date:

Serial Number:

In order to minimize troubleshooting and costly system failures, complete the following checks and data
entries before the system is put into full operation.
MODE
Entering fluid temperature
Leaving fluid temperature
Temperature differential
Water coil heat exchanger
(Water Pressure IN)
Water coil heat exchanger
(Water Pressure OUT)
Pressure Differential
COMPRESSOR
Amps
Volts
Discharge line temperature
(after 10 minutes)
24
Start-up Checklist
and Log
Use this form to thoroughly check-out the system and units before and during
Source
F
F
F
PSIG
PSIG
PSIG
F
HEAT
Load
Source
F
F
F
PSIG
PSIG
PSIG
F
COOL
Load
F
F
F
F
F
F
PSIG
PSIG
PSIG
PSIG
PSIG
PSIG
F
F
WSHP-SVX02A-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

GswdWpwd

Table of Contents