Preparing The System For Operation - IBM Power System 9009-41A Manual

Hide thumbs Also See for Power System 9009-41A:
Table of Contents

Advertisement

Figure 84. Replacing the air baffle in a stand-alone system
Preparing the 9009-41A, 9009-42A, or 9223-42H system for operation after removing
and replacing the control panel cable
To prepare the system for operation after removing and replacing a control panel cable, complete the
steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 85 on page 89.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
88 Power Systems: Power Systems: Control panel

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system 9009-42aPower system 9223-42h

Table of Contents