Transfer Chassis To A Mechanical Lifting Device - Cisco NCS 5500 Series Hardware Installation Manual

Modular routers
Hide thumbs Also See for NCS 5500 Series:
Table of Contents

Advertisement

Transfer Chassis to a Mechanical Lifting Device

1
Note
Use at least three screws on each end of each bottom-support rail.
Step 3
Repeat Steps 1 and 2 to attach the other bottom-support rail to the rack.
Make sure that the two bottom-support rails are level with one another. If they are not level, adjust the higher
Note
rail down to the level of the lower rail.
What to do next
Mount the chassis into the rack.

Transfer Chassis to a Mechanical Lifting Device

Step 1
Place the mechanical lifting device in front of the chassis on the pallet (PLIM side) as shown in
Lifting Device In Front of the Chassis on the Pallet , on page 35
Hardware Installation Guide for Cisco NCS 5500 Series Modular Routers
34
Adjustable bottom-support
rails (2)
2
.
Install the Chassis
M6 x 19 mm (or 12-24 x 3/4
in.) Phillips screws (at least
6 per rail)
Figure 10: Align the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 5508Ncs 5504Ncs 5516

Table of Contents