Brick Installation - Quadra-Fire HUDBAY-FS Installation Manual

Hide thumbs Also See for HUDBAY-FS:
Table of Contents

Advertisement

F. Brick Set Installation
Pilot Bracket
The pilot shield has to be removed to install or
Figure 8.11 -
remove the brick refractory. Removal of the bracket requires
removing two screws.
To install the baffle, slide it in at an angle
Figure 8.12 -
and rotate upward parallel with the firebox. Place baffle
up against the heat exchangers in top of the firebox. Hold
against heat exchangers, slide baffle towards front of
appliance.
Keeping the baffle elevated with your hand, put
Figure 8.13 -
the right side brick into position. Rest the baffle on the rights
side brick.
31
Pilot
Shield
Quadra-Fire • Hudson Bay Installation Manual_R26 • 01/20
Still holding the baffle in place, install the left
Figure 8.14 -
brick into position.
2 retaining tabs
on right and left sides
Bend retaining tabs on the left and right sides
Figure 8.15 -
inward to hold brick in place.
Install the rear brick. Slide it in at an angle and
Figure 8.16 -
place over the rear brick retainer. Hand bend retaining tabs
up to hold brick in place. Push baffle towards back of firebox.
3-90-7003999

Advertisement

Table of Contents
loading

Table of Contents