Installation Information Preparing For Installation; Symbols; Designation Of Boiler Types - Viessmann Vitomax LW M64 Installation Instructions Manual

Low pressure hot water boilers
Hide thumbs Also See for Vitomax LW M64:
Table of Contents

Advertisement

Preparing for installation

Symbols

Symbol
Meaning
Reference to other document containing
further information
Step in a diagram:
1.
The numbers correspond to the order in
which the steps are carried out.
Warning of material losses and environ-
mental pollution
Live electrical area
Pay particular attention.
Component must audibly click into place.
or
Acoustic signal
Fit new component.
or
In conjunction with a tool: Clean the sur-
face.
Dispose of component correctly.
Dispose of component at a suitable collec-
tion point. Do not dispose of component in
domestic waste.
Note
All diagrams in this document are schematic, illustra-
tive examples.

Designation of boiler types

Capital letters indicate the respective stage of develop-
ment (version) of the boiler type.
Example M62C: Boiler type M62 version C
4
The steps in connection with commissioning, inspec-
tion and maintenance are found in the "Commission-
ing, inspection and maintenance" section and identified
as follows:
Symbol
Meaning
Steps required during commissioning
Not required during commissioning
Steps required during inspection
Not required during inspection
Steps required during maintenance
Not required during maintenance

Advertisement

Table of Contents
loading

Table of Contents