Overview of work steps with service log
No.
Work step
1
Switch off device, Emergency-switch off
2
Close gas feed,
3
Remove jacket and combustion area housing
4
Remove the electrical connections on the fan, sensors
and electrodes
5
Remove combustion chamber cover from above.
6
Clean burner as needed
7
Clean hot water heat exchanger
8
Clean condensate sump
9
Clean mixing chamber as needed
10
Check combustion chamber insulation for damage
11
Check gaskets, replace as needed and lubricate with silicon grease
12
If neutralization is present, refill with granulate
13
For enameled hot water storage, check magnesium sacrificial anode every 2 years
14
Reassemble device
15
Clean siphon, fill, mount, and ensure firm seat
16
Decalcify hot water heat exchanger as needed
17
Deline SHW-non-return valve if required
18
Clean hot water sieve
19
Check expansion vessel if there is water loss
20
Open gas feed, switch device on
21
Check for gas leaks
22
Check for exhaust system leaks
23
Check starter
24
Check the interplay with control accessories
25
Measure exhaust gas at chimney sweep mode
26
Gross exhaust gas temperature
27
Intake air temperature
28
Net exhaust gas temperature
29
Carbon dioxide content (CO
30
Or oxygen content (O
31
Carbon monoxide content (CO)
32
Exhaust gas loss
Confirm service (company stamp, signature)