4.
Position the rear carrier frame
the rear cutting unit.
Figure 18
1. Rear carrier frame
5.
Secure the mounting links to the rear carrier
frame as follows:
•
Secure the front mounting links to the carrier
frame holes with a bolt (3/8 x 2-1/4 inch),
2 flat washers, and a locknut, as shown in
Figure
19. Position a washer on each side of
the link when mounting. Torque the fasteners
to 42 N∙m (31 ft-lb).
•
Secure the rear mounting links to the rear
carrier frame holes with a bolt (3/8 x 2-1/4
inch), 2 flat washers, and a locknut, as
shown in
Figure
each side of the link when mounting. Torque
the fasteners to 42 N∙m (31 ft-lb).
(Figure
18) onto
19. Position a washer on
1. Rear carrier frame
2. Front mounting link
11
g012003
Mounting the Cutting Units
No Parts Required
Procedure
1.
Slide a thrust washer onto each front lift arm
pivot rod.
2.
Slide the cutting unit carrier frame onto the pivot
rod and secure it with a lynch pin
Note:
On rear cutting unit, position the thrust
washer between the rear of the carrier frame
and the lynch pin.
1. Thrust washer
2. Carrier frame
19
Figure 19
3. Rear mounting link
(Figure
Figure 20
3. Lynch pin
g012689
20).
g012016