Download Print this page

Trane BAYEVCC25BK1A Installer's Manual page 6

25 kw supplementary electric heater

Advertisement

INSTALLER'S GUIDE
Important: If using a BAYSUPFLGA, B, or C Supply
Duct Flange Kit, install the kit before inserting the
heater.
STEP 3 - Insert heater assembly into heater compart-
ment.
1.
Move factory wiring out of the way and into the grooves
provided in cabinet.
2.
Slide heater into heater compartment of air handler.
STEP - 4 Lock Retainer tabs.
Note: Retainer tabs are used to secure the heater
inside of the heater compartment.
1.
Slide retainer tab into recess in air handler cabinet.
2.
Tighten screws to hold tab securely.
3.
Repeat actions to secure the other tab.
STEP 5 - Select a conduit entry point. See the
orientations on the following pages for entry point
selections.
1.
Select the entry point on the control box cover you will
use to bring in your high voltage wiring.
2.
Remove knockout from the entry point.
3.
Remove the plug from the 1-1/2" hole in the cabinet.
4.
After the ductwork is installed, secure the control box to
the top panel of the air handler.
Note: Use the low torque setting when attaching
the screws to the unit.
Page 6
Conduit Entry Points (4 total)
Retainer
Tab

Hide quick links:

Advertisement

loading