Roof Removal
1. Remove the screws (A) that secure the roof to the unit.
2. Carefully lift and remove the roof from the unit.
Front Panel Removal
1. Remove the two screws (A) that secure the panel to the
unit.
2. If installed (for wind rated regions), remove the two
screws (B) that secure the panel to the base.
3. Lift and flex panel outward and off of the base. Use
caution not to damage the battery box.