Installation and commissioning

3
Installation and commissioning
CAUTION:
Electrical work
Electrical work must only be carried out by a qualified
electrician.
▶ Before starting electrical work:
Isolate the mains electrical supply and secure against
unintentional re-connection.
▶ Check for zero voltage.
▶ Also observe connection diagrams of other system
components.
For information on the heat source,  Technical
documentation for the heat source.
These instructions contain the installation and operating
instructions for the Comfort+ II RF control unit.
3.1

Installation and commissioning key

Installation in the heat source
Prior to installation, make sure the strength of the wireless
signal at the installation location is sufficient.
▶ Isolate the mains electrical supply and secure against
unintentional re-connection.
▶ Install the key in the heat source. For information in
installing in the heat source,  Technical documentation
for the heat source.
1.
Fig. 2
Installing the key
6
2.
0010022807-001
▶ Switch on the heat source.
1.
2.
Fig. 3
Initialisation
The control unit and key are connected at the factory in the
delivered condition and detect each other automatically
when switching on. It is not necessary to connect/
disconnect unless there is a problem exists with one or both
of the wireless devices.
▶ Insert the batteries in the control unit ( sec 16, page
19).
▶ The key and control unit connect automatically.
While the connection is being established, the control unit
shows a countdown starting with 120.
Once installed the display shows the current room temperature
after the connection has been established.
▶ Ensure that the signal strength is adequate at the
installation location for the control unit, before you install it
( Chapter 5.5).
▶ Install the control unit.
3.2

Installation and commissioning of the control

unit

Putting the control unit into operation
The control unit uses wireless frequencies. It therefore offers
flexibility in terms of selecting a position. Connection of cables
is not required.
Air must be able to circulate freely round the control unit and it
must be installed on an open surface unhindered by curtains or
furniture. The control unit must not be positioned closer than
300 mm to metal objects, including wall-mounted metal boxes.
Do not mount the control unit on a wall where it will be exposed
to sunlight or draughts, preferably on an inside wall 1.2 m
above the floor.
Comfort+ II RF – 6720886122 (2018/07)
3.
yellow
0010022813-001

Advertisement

Table of Contents
loading

Table of Contents