Kohler K-11344 Installation And Care Manual page 8

Bath with airjets
Hide thumbs Also See for K-11344:
Table of Contents

Advertisement

Available languages

Available languages

Drain
Finished Floor
Drain Pipe
4. Position Two Foot Clips (Without Shroud)
Turn the bath shell over and set it in position on the finished floor. Make sure the drain lines up
with the drain pipe and there is no drain interference with the floor.
Position each locking plate with the hole to the outside of the bath.
Trace around the edges of the two foot clips located at the front of the bath, opposite the overflow.
Lift the bath and turn it upside down on saw horses.
1220597-2-F
Overflow
Bath
Front
8
Locking Plate
with Hole
Kohler Co.

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-14037

Table of Contents