InteliMains New Technology - Mains supervision controller; the same controller with a different SW
configuration can work as a bus-tie synchronizer
I-RB
Relay Board
IS-AIN8
Extension module with 8 AI
IS-BIN8/16
Extension module with 8 BO and 16 BI
IS-NT
InteliSys New technology genset controller
IS-NT-BB
InteliSys New Technology Basic Box (without display)
KWP2000
Key Word Protocol of Scania S6 unit (for engine diagnostics)
LAI
Logical Analog Inputs (card in GenConfig which is used to assign source signal to controller Logical
Analog Input functions, e.g. Oil press)
LBI
Logical Binary Inputs (card in GenConfig which is used to assign source signal to
controller Logical Binary Input functions, e.g. Sys Start/Stop)
LS
Load Sharing - analog load sharing line to interconnect gensets on site (for island parallel or mains
parallel operation of multiple gen-sets); IG/IS/IM-NT controllers use digital Load Sharing via the CAN2
bus
LSM
Load Sharing Module
LT
Option for Low Temperature modification (display equipped with heating foil)
MCB
Main Circuit Breaker
MGCB
Master Generator Circuit Breaker (sometimes used with multiple gensets in island parallel or mains
parallel operation)
MINT
Multiple application with INTernal control loops - for multiple gensets in island
parallel or mains parallel operation; Load Sharing and VAr Sharing controlled internally; PMS avail-
able
MP
Mains Protection
MultlslOp
Multiple Island Operation (MCB is opened, GCB's are closed)
MultParOp
Multiple Parallel Operation (MCB is closed, GCB's are closed)
NPU
Mains protection relay (voltage, frequency, vector shift protections)
OC
Occurrence Count (number of fault occurrences transmitted in diagnostic frame
from ECU)
OfL
Off load - protection type (see application manual for details)
PF
Power Factor
PGN
Parameter Group Number (see SAE J1939-71)
PMS
Power Management System - ensures optimization of running gensets on sites with multiple gen-sets;
based on kW/kVA spinning reserve or on relative (%) load;
no-master system ensures high reliability
Reverse synchroni-
Synchronisation of loaded genset to mains (MCB closing process)
sation
RTC
Real Time Clock
SG
Speed Governor
SHAIN
SHared (virtual) Analog INput module
44
Table 7 - Digital Controller Alarm Abbreviations
MGG155/210 Operating Manual
Description
35319 C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgg210

Table of Contents