1 Abstract
This document describes the process used for flashing software upgrades and how to
functionally test the mobile phone.
If there are any failures, the mobile must be repaired according to the troubleshooting
guide or sent to a higher repair level.
2 Test Procedure
To verify all components within Mechanical repair package all tests must be
performed.
2.1
Test flow
It's OK to return the phone to the customer if the unit is passing these steps of testing
without any failures. If there are any failures, the phone must be repaired according
to the troubleshooting guide or sent to higher repair level.
2/000 21-1/FEA 209 544/126 B
©
Company Internal
Sony Ericsson Mobile Communications AB
Test Instruction, Mechanical
2(13)