Commissioning Checklist - Bosch Worcester Greenstar HIU E Installation And Maintenance Instructions Manual

Heat interface unit
Hide thumbs Also See for Worcester Greenstar HIU E:
Table of Contents

Advertisement

Commissioning
6.13

Commissioning checklist

Customer name:
Address:
Installed by (print name):
Company name:
Company address:
Commissioned by (print name):
Company name:
Company address:
Building Regulations Notification Number (if applicable):
1
Appliance make and model:
2
Appliance serial number:
Commissioning
3
The central heating has been flushed and cleaned in
accordance to the standards and guidelines
4
System Hydraulic:
Network isolated (indirect) with internal pump:
Single zone radiator circuit (unmixed)
Single zone under-floor circuit (unmixed) + over-temperature
protection
Network isolated (indirect) without internal pump
Single zone radiator circuit (unmixed) + single zone under-floor
circuit (mixed) + over-temperature protection
5
Fill the central heating system and check for leaks
6
Pressurise the central heating and record the value
7
Check for leaks during operation
8
Measure and record values: District system
Differential Pressure Control Valve arrangements
Internal HIU DPCV
External DPCV installer supplied
Model type:
No DPCV, supply differential pressure less than 80kPa
(800mbar)
Static district pressure (max system pressure)
Working district pressure
Primary pressure system breaks
Flushing by-pass fitted and closed
Dwelling isolation valves fitted
Strainers has been checked and cleaned
Table 31
48
Telephone number:
Installation date:
Telephone number:
Registered Operative ID number:
Telephone number:
Unit
Values
Comment
bar
bar
Setting
bar (g)
bar
Yes 
Yes 
Yes  Location:
Yes 
6 720 808 928 (2017/06)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Worcester greenstar hiuWorcester greenstar hiu e plusWorcester greenstar hiu ke plusWorcester greenstar hiu e

Table of Contents