Download Print this page
Heat & Glo LOGS-750TRS-E Log Placement Instructions

Heat & Glo LOGS-750TRS-E Log Placement Instructions

Model: sl-750trs-ipi-d, sl-750trs-ipi-e, sl-750trsfhhipi

Advertisement

Quick Links

Log Set Assembly: LOGS-750TRS-E
Model: SL-750TRS-IPI-D, SL-750TRS-IPI-E
SL-750TRSFHHIPI
STEP 1.
CAUTION: Logs are fragile, handle with care.
Carefully remove the logs from the packaging.
STEP 2.
LOG #1 (SRV2117-701) Place log #1 on left fl at side of
the burner assembly. Pull the log forward and slide it to
the right until the notches under the log are in the burner
grooves.
FLAT AREA FOR LOG #4
FLAT AREA FOR LOG #4
NOTCH FOR PILOT
NOTCH FOR PILOT
STEP 3.
LOG #2 (SRV2120-702) Place log #2 on the grate bar
and push it back against refractory. The pilot should be
centered within the large notch on log #2.
LOG NOTCHES
LOG NOTCHES
Heat & Glo • LOGS-750TRS-E • 2120-945 • 3/11
1 1
2 2
1 1
Figure 1.
1
1
Figure 2.
LOG PLACEMENT
INSTRUCTIONS
3 3
4 4
2 2
5 5

Advertisement

loading

Summary of Contents for Heat & Glo LOGS-750TRS-E

  • Page 1 STEP 3. LOG #2 (SRV2120-702) Place log #2 on the grate bar and push it back against refractory. The pilot should be centered within the large notch on log #2. Figure 2. Heat & Glo • LOGS-750TRS-E • 2120-945 • 3/11...
  • Page 2 STEP 6. LOG #5 (SRV2117-705) Place log #5 on log #2. Log #5 will mate with the fl at areas located on the top side of Log #4. See Figure 5. Heat & Glo • LOGS-750TRS-E • 2120-945 • 3/11...