Bosch Worcester GREENSTAR CDi Series Instruction Manual page 14

Wall hung rsf gas-fired condensing combination boiler for sealed central heating systems and mains fed domestic hot water
Table of Contents

Advertisement

BOILER LOCATION
&
CLEARANCES
aoomm
BATHROOMS:
750mm
The boiler can be installed in zones 2 or 3. If a
mechanical or RF mechanical timer or text dis-
®
@
CD
CD
play with room thermostat (IP 20 only) is fitted
the boiler can only be installed in zone 3.
@
®
2250mm
A Non mechanical timer can be installed in
zone 2.
See lEE wiring regulations.
(See Technical Data for IP ratings.}
IMPORTANT: any switch or appliance
control using 230 V mains electricity must
not be able to be touched by a person
using the bath or shower.
Electrical switches, fused spur and socket
outlets must not be situated in the bath-
aoomm
room.
750mm
For further information about bathroom installa-
lions please consult Operational Procedures
Part 20, Electricity.
@
®
2250mm
600mm radius
6720611927-13.10
BOILER LOCATION & CLEARANCES
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 25CDI/30CDI/37CDI/42
co;
~ O R C E S T E R
6 720 613 700a (2006/11)
Bosch Group

Advertisement

Table of Contents
loading

Table of Contents