Siemens Simatic PCS 7 Commissioning Manual page 54

Process control system foundation fieldbus
Hide thumbs Also See for Simatic PCS 7:
Table of Contents

Advertisement

Commissioning
5.1 Compile and download
Download
Use the following menu commands to download the respective data to the system.
Menu command
For a CPU with FF Link , you always download the
hardware configuration to HW Config.
PLC > Download to Module
The menu command PLC > Compile and Download
Objects... in the SIMATIC Manager.
In SIMATIC PDM, select the FF Link
Device > Download to Devices
Select the "Object with all subordinate objects and
networks" check box in the "Download to devices"
dialog.
Select the FF device in SIMATIC PDM Device >
Download to devices
Select the "Object with all subordinate objects"
check box in the "Download to devices" dialog.
Note
You can download changes to the automation system in "RUN" mode (CIR). Note the settings
for "Load FF Segment".
Settings for "Load FF Segment"
You can make settings in the object properties of the FF link in HW Config that are taken into
consideration during an AS download.
Perform the following steps:
1. Open the hardware configuration in SIMATIC Manager.
2. Open the object properties of the FF Link.
54
CPU data
Schedule, bus
parameters and
interconnections
Hardware
Downloading
configuration is
downloaded
Program and
connections are
downloaded
-
-
Only when replacing a
device with one of the
same type:
Select the check box
"Load Schedule to
Device".
Commissioning Manual, 03/2013, A5E03880935-02
Device parameters
-
-
All FF devices will be
downloaded.
-
The FF device is
downloaded
FOUNDATION Fieldbus
-
-