Assembly - Mantis MR991 Use And Maintenance Instructions

Integrated treatment system with endodermic massage and application of pulsed magnetic fields with stochastic resonance
Table of Contents

Advertisement

6.4.2

Assembly

Carry out all assembly operations before connecting the equipment to the
power supply.
1) Remove the cable conduit cover (22) by unscrewing the knob screw (22P).
2) Unscrew the four screws on the frame underneath the cable conduit cover which was
previously disassembled.
3) Place the transparent handpiece holder (21) by centering it using the pivot to which the fixing
knob of the cable conduit cover was fixed (22P).
4) Reinsert and tighten the screws which were previously
removed in order to assemble the transparent handpiece
holder (21).
5) Reassemble the cable conduit cover by fixing it with the knob
again (22P).
6) Disassemble the lower cover (23) by pulling gently and insert
the LED power connector into the socket (31).
7) Insert the Vixo connector case into the supplied rod.
8) Put the handpiece in place on the handpiece holder (2),
making sure that it is properly positioned.
32
35
36
40
41
42
44
4
3
31
33
34
39
43
2
5
37
38
4
3
24
25
16
22P
22
21
2
5
22
23
27
26

Advertisement

Table of Contents
loading

Table of Contents