Installation and commissioning

5.3 Commissioning

Note
MRP configuration
With an MRP configuration, keep to the setup guidelines for MRP.
You will find examples of network attachments and MRP setup guidelines in the general Part
A of this manual /2/ (Page 118).
Separating the PROFINET and the gigabit interface
It is advisable to connect the PROFINET interface and gigabit interface physically to
separate networks. If the two interfaces are not separated, problems can occur when
establishing an S7 connection using the ISO protocol under the following conditions:
● Connections to the same partner address were configured via different interfaces.
● When an S7 connection configured at one end needs to be established.
5.3
Commissioning
The steps for commissioning the CP are explained below. Commissioning involves the
address assignment and downloading the configuration data and user programs.
Result: The CP is reachable in the network and has been supplied with configuration data.
58
CP 443-1 Advanced (GX30)
Manual, 03/2019, C79000-G8976-C256-05