Checking The Water Chamber For Deposits - Viessmann Vitomax HW Series Operating And Service Instructions

High pressure hot water boilers
Hide thumbs Also See for Vitomax HW Series:
Table of Contents

Advertisement

Commissioning, inspection, maintenance
Inserting turbulators (if installed) and closing boiler door(s)
A
B
Fig. 8
Closing and securing the inspection ports
B
A
Fig. 9
Mounting the burner (if required)
C
B
A
Fig. 10

Checking the water chamber for deposits

1. Fully drain the boiler.
2. Clean the water chamber by hosing it down.
Remove deposits via the drain outlet.
Remove stubborn deposits with approved chemical
solvents.
20
1. Fully insert turbulators
bulator extractor
.
B
2. Close the boiler door(s).
3. Tighten screws evenly to 20 Nm.
Fit in reverse order to the description on page 18
(tightening torque 20 Nm)
Danger
Risk of explosion from escaping gas.
Check all gas connections for tightness.
1. Fit burner tile
to burner flange
B
A
.
2. If necessary, seal the annular gap between the
flame head and the insulation rings with heat-
resistant insulation material.
3. Connect the fuel supply lines (pressure-jet gas
burners: gas supply pipe).
3. Clean the sealing faces and thread of the inspec-
tion port. Replace the gaskets. Lubricate the
thread. Retighten the new gaskets after commis-
sioning (see table on page 17). Check again after
24 hours run.
A
into the 3rd flue. Use tur-
with screws
C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents