Aligning The Film Guide - Kodak RP X-OMAT M6B Installation Instructions Manual

Hide thumbs Also See for RP X-OMAT M6B:
Table of Contents

Advertisement

[2]
Adjust the position of the FEED SHELF so
that it is approximately 1 mm (1/16 in.) lower
than the NIP of the DETECTOR
CROSSOVER ROLLERS.
[3]
When the height is adjusted correctly, tighten
the 5 SCREWS.
Do not tighten the WING NUTS.

Aligning the Film Guide

[1]
Insert a 35 x 43 cm (14 x 17 in.) film.
WING NUT (3)
SCREW (5)
[2]
Use the edges of the film to align the FILM GUIDE with the DETECTOR CROSSOVER ASSEMBLY for
squareness.
[3]
Tighten the 3 WING NUTS.
246626
NOTE
FEED SHELF
Figure 19 Installing the Film Guide Assembly
Approximately
1 mm (1/16 in.)
3 WING NUTS
Figure 18 Installing the Feed Shelf
FILM
GUIDE
DETECTOR
CROSSOVER
ASSEMBLY
DETECTOR
CROSSOVER
ENTRANCE
ROLLERS
NIP
5 SCREWS
H108_0038ACB
H108_0038AA
H108_0034BCA
H108_0034BA
21

Advertisement

Table of Contents
loading

Table of Contents