Wiring Diagram - Trane WTK507 Installation Manual

Split water-cooled condensing units 7,000 - 60,000 btu/h, 50 hz
Table of Contents

Advertisement

POWER CIRCUIT
CONTROL CIRCUIT FOR MODEL WITHOUT HPCO AND LPCO
CONTROL CIRCUIT FOR MODEL WITH HPCO AND LPCO
BYPASS LPCO WHEN UNIT START, BYPASS TIME PERIOD CAN BE SETTING 0-4.5 MINS
C1
2R-1
COLOR CODE
BL BLUE
BLK BLACK
RD RED
* 2TC AVAILABLE IN OPTIONAL MODEL
** APPLY FOR DOUBLE POLE CONTACTOR ONLY
(FOR SINGLE POLE CONTACTOR,CONNECT ELECTRIC
LINE FROM COMPR-C DIRECT TO TERMINAL-N)
NOTES:
1. LOW VOLTAGE WIRING TO BE
18 AWG MINIMUM CONDUCTOR.
2. POWER WIRING AND GROUNDING OF
EQUIPMENT MUST COMPLY WITH
LOCAL CODES.
3. USE COPPER CONDUCTOR ONLY.
12

Wiring Diagram

POWER SUPPLY 220-240V/1ph/50Hz, 200-240V/1ph/60Hz
L
MS-1
RD
CR
BL
*2TC
C1
1TC
(FOR BY PART LPCO WHEN UNIT START)
BLK
1R
1R-7
LPCO
HPCO
2R
2R-5
2R-2
2R-6
220-240V/1ph/50,60Hz
N
MS-2
R
BLK
CPR
C
S
MS
FROM INDOOR UNIT
200-240VAC/1ph/50,60Hz
1R-8
1R
1R-1
1R-5
FROM INDOOR UNIT
LEGEND
CPR
COMPRESSOR
MS
COMPRESSOR MOTOR CONTACTOR
HPCO
HIGH PRESSURE CUT-OUT
LPCO
LOW PRESSURE CUT-OUT
TC
TIME-DELAYED CONTACT 3 MINUTES
TERMINAL
COIL
TERMINAL BOARD BY OTHER
TERMINAL BOARD BY FACTORY
FIELD WIRING
FACTORY WIRING
RELAY CONTACT NORMALLY OPEN
CAPACITOR
LOW PRESSURE SENSING SWITCH
HIGH PRESSURE SENSING SWITCH
1R
LOCK OUT CIRCUIT RELAY
2R
LOW PRESSURE SENSOR BYPASS RELAY
G
C2
2R
2R-7
2R-8
*2TC
MS
1R-6
C2
WTK-SVN001-EN

Advertisement

Table of Contents
loading

Table of Contents