9.2.
Checking of SMPS P.C.B.
Step 1 : Remove Top Cabinet.
Step 2 : Remove Front Panel Unit.
Step 3 : Remove Panel Block.
Step 4 : Remove Antenna P.C.B..
Step 5 : Remove SMPS P.C.B..
Step 6 : Place Panel Block on a support block.
Step 7 : Connect 5P wire at connector (CN4300) on Main
P.C.B..
Step 8 : Connect 21P FFC at connector (CN8001) on Main
P.C.B..
Step 9 : Place Antenna P.C.B. on an Insulated Material.
Step 10 : Connect antenna wire at connector (J2) on
ALLPLAY Module.
41