This page is a mandatory checklist & record – the check to be executed and data to be recorded for future reference incase of failure.
A copy of this checklist data has to be submitted to carrier representative. Completion of this checklist is a must for any field claim, no field support will be provided for incomplete or
Outdoor Model Number:
Indoor Model Number:
Startup Date:
Additional Accessories:
Is there any shipping damage?
If the unit is damaged, Please specifiy where:
Will this damage prevent the unit start-up?
Check power supply to see if it matches the unit data plate?
Has the ground wire been properly connected?
Are the circuit protection to the unit sized and installed properly?
Are the power wires to the unit sized and intalled properly?
Are refrigerant lines connected to service valve sets?
Are control power lines connected to control power terminal block?
Are terminal snug in the housing?
Are the service valves opened and backseated ?
Are the Stem Valves Installed and snug?
Have all the refrigerant connections and piping joints checked for leaks?
Check if the accurater device is installed in fan coil unit?
Have refrigerant connections been checked for leak?
Is condensate line connected?
Does condensate line drain freely?
Are control power lines and control cables routed separately (Not in the same conduit and not in same multi-conductor cable?
Are control wires connected to the same circuit as associated refrigerant lines?
Check to make sure the subbase mounting to wall is secure? ( Don't apply excessive force to mounting screw)
Check mounting of interface board, are standoffs used to maintain fixed sepration above sheet metal chassis?
Check connection of power supply plug (2-circuit molex plug) on interface board, is the blue lead connected to pin1?
Are fresh batteries intalled properly in the fan coil remote controller?
Does remote controller backlight illuminate when the button is pressed?
Does fan rotate freely?
Are air filters in place?
Does the power supply match the fan coil unit data plate?
Is ground wire connected?
Select fan mode, then initiate test sequence. Does the fan coil start at low speed , then shift to medium then to high?
Select cooling mode and adjust set point to be below current room temperature, Observe operation of outdoor condensing unit
Does compressor start (After Initial Time Delay) and Run?
Does outdoor fan run or cycle according to space requirements?
De-select cooling mode at indoor fan coil unit, after atleast 15 minutes of running time and record all information below:
Outdoor Unit
Compressor Amps(L1/L2/L3)
Oil Pressure
Vapor Line Pressure
Vapor Line Temp
Discharge Pressure
Discharge Line Temp
Entering Outdoor Air Temp
Leaving Outdoor Air Temp
MANDATORY START-UP CHECK LIST AND RECORD
IMPORTANT!
blank checklists.
Preliminary Information
Pre-Start-Up Checklist
Outdoor Unit
Piping
Indoor Fan Coil Unit Piping
Controls
Units With Wireless Remote Controller
Fan System
Indoor Power Supply
Start-Up Checklist
Check Indoor Fan Operation Under Ceiling Fan Coil Units
Start System Operation at the Fan Coil Unit
Page 40
Outdoor Serial Number:
Indoor Serial Number:
Technician Name:
Fan Coil Unit
Indoor Entering Air dB(Dry Bulb) Temp
Indoor Entering Air dB(Wet Bulb) Temp
Indoor Leaving Air dB(Wet Bulb) Temp
Indoor Leaving Air dB(Wet Bulb) Temp
Yes
No
NA
Yes
No
NA