asieps_tobira_IM_US.book 8 ページ 2012年1月17日 火曜日 午後3時48分
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)
5. Purge Control Solenoid Valve
A: REMOVAL
1) Disconnect the ground cable from the battery.
2) Disconnect the connector and hoses from purge
control solenoid valve.
3) Loosen the bolt and remove the purge control
solenoid valve from the intake manifold.
(A) Purge control solenoid valve 1
(B) Purge control solenoid valve 2
Purge Control Solenoid Valve
B: INSTALLATION
Install in the reverse order of removal.
Tightening torque:
(A): 19 N·m (1.9 kgf-m, 14.0 ft-lb)
(B): 6.4 N·m (0.65 kgf-m, 4.7 ft-lb)
FU-00009
NOTE:
Connect the evaporation hose as shown in the fig-
(B)
ure.
(A)
EC-02181
C: INSPECTION
Make sure the hoses are not cracked or loose.
EC(H4DOTC)-8
(A)
(A) Purge control solenoid valve 1
(B) Purge control solenoid valve 2
(B)
(a)
(A)
(c)
(b)
(A) Purge control solenoid valve 1
(B) Purge control solenoid valve 2
(a) To intake duct
(b) To intake manifold
(c) Branch pipe → fuel pipe
(B)
EC-02181
(c)
EC-02182