4-3 Appropriate Measures for Different Symptom
4-3-1 Outdoor Unit Test Operation Flow
Preilminary check for the Test Operation
4-18
Power On
Execute the Auto Trial Operation
Was Auto Trial Operation
Completed?
Yes
Trial Operation available
No
If the Auto Trial Operation is not completed - UP is displyed(UnPrepared)
Prior to starting the air conditioning operation after the ini-
t i a l i n s t a l l a t i o n a n d Au t o Tr i a l O p e r a t i o n i s c a r r i e d o u t .
This process, the stable operation to protect the system and verify the
defect of the product.
1. Tracking is complete and after the initial installation, if you do not
have a history of Auto Trial Operation is completed, UP will be dis-
played.
2. Execute the Auto Trial Operation by Tact Switch.
3. UP display disappears after Auto Trial Operation is complete, normal
operation is possible.
4. Auto Trial Operation is completed, if there is a history, normal opera-
tion execution.
LED display the UP (UnPrepared)