123Filter iSpring Reverse Osmosis Water Filtration Installation Instructions & Owner's Manual page 14

Table of Contents

Advertisement

 
 
 
7.2 Facing the front of the system, 1st stage is the see through housing located on the right hand 
side. Connect the ​
fitting (point B).  
7.3 Connect the Flow Restrictor (point C, 3­inch long cylinder with a FLOW labeled on it) to the 
Drain Saddle (point D) with the ​
7.4 On the right side of the Post Carbon Filter (FT15, 5​
the Tank Valve (point F) with the ​ Y ELLOW​   tubing.   
7.5 * Models ​ w ithout​   UV/AK/DI (5 stage systems): At the left end of the stage 5 FT15 filter, insert 
the ​
B LUE​
  tubing (links to RO faucet) into the elbow fitting.  
Page 13                            ​
R ED​
  tubing Feed Water Adapter (AFW) (point A) to the stage 1 elbow 
B LACK​
w ww.123filter.com​
    |   (678) 261­7611   |   ​
  tubing.  
th​
 stage), connect the T­fitting (point E) and 
S
upport@123Filter.com 
 
 
 

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for 123Filter iSpring Reverse Osmosis Water Filtration

Table of Contents