Overview of the steps to be taken and maintenance report
No. Step
1
Switch OFF the boiler, emergency stop switch is OFF
2
Close the gas supply valve
3
Remove the casing and the combustion chamber housing
4
Unplug the electrical connections from the fan, sensors and
electrodes
5
Remove the combustion chamber lid upwards
6
Clean the burner, if required
7
Clean the heating water heat exchanger
8
Clean the condensate pan
9
Clean the mixing chamber, if required
10
Check the combustion chamber insulation for damage
11
Check gaskets, and if required, replace them and
lubricate with silicone grease
12
Refill granulate, if a neutralising system is installed
13
Check the protective anode every two years on enamelled
cylinders
14
Assemble the equipment
15
Clean and fill the siphon, install and check for tight fit
16
Descale the DHW heat exchanger, if required
17
Clean the DHW strainer
18
Check the expansion vessel in case of water loss
19
Open the gas supply valve and start the boiler
20
Gas leak test
21
Flue gas leak test
22
Check the ignition
23
Check the interaction with control accessories
24
Flue gas test in emissions test mode
25
Gross flue gas temperature
26
Ventilation air temperature
27
Net flue gas temperature
28
Carbon dioxide content (CO
29
or oxygen content (O
30
Carbon monoxide content (CO)
31
Flue gas loss
Confirm maintenance (company stamp, signature)
10
Overview of the steps to be taken
and maintenance report
)
2
)
2
Report item
Report item
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
°C
°C
°C
%
%
%
%
Report item
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
°C
°C
°C
°C
°C
°C
%
%
%
%
%
%
%
%
30 62 556_0709

Advertisement

loading

This manual is also suitable for:

Cgb-100