Carrier 50HCQA05 Service And Maintenance Instructions page 24

Single package heat pump/electric heat nominal 3 to 10 tons with puron r-410a refrigerant
Hide thumbs Also See for 50HCQA05:
Table of Contents

Advertisement

Inputs
Point Name
G Fan
Y1 Cool 1
Y2 Cool 2
W1 Heat 1
W2 Heat 2
R Power
C Common
DFT1
DFT 2
Outputs
Point Name
IFO Fan On
OF OD Fan On
RVS1
RVS2
COMP 1
COMP 2
HEAT 2
COM
Configuration
Point Name
Select Jumper
2 Compressor
Speed- - Up Configuration
Point Name
Speed --- Up Jumper
Speed --- Up Jumper
Jumper for 1- -3 seconds: Factory Test, defrost runs for 9 seconds
Jumper for 5- -20 seconds: Forced Defrost, defrost runs for 30 seconds if DFT2 is open
Reversing valve control — The DFB has two outputs for
unit reversing valve control. Operation of the reversing
valves is based on internal logic; this application does not
use an "O" or "B" signal to determine reversing valve
position. Reversing valves are energized during the
cooling stages and the defrost cycle and de- - energized
during heating cycles. Once energized at the start of a
cooling stage, the reversing valve will remain energized
until the next heating cycle demand is received. Once
de- - energized at the start of a Heating cycle, the reversing
valves will remain de- - energized until the next cooling
stage is initiated.
Fig. 33 - - Defrost Control Board Location
Table 8 – 50HCQ Defrost Board I/O and Jumper Configurations
Type of I/O
Connection Pin Number
DI, 24Vac
DI, 24Vac
DI, 24Vac
DI, 24Vac
DI, 24Vac
24Vac
24Vac
DI, 24Vac
DFT--- 1 to DFT--- 1
DI, 24Vac
DFT--- 2 to DFT--- 2
Type of I/O
Connection Pin Number
DO, 24Vac
DO, 24Vac
DO, 24Vac
P3--- 7 to P3--- 5
DO, 24Vac
P3--- 6 to P3--- 4
DO, 24Vac
DO, 24Vac
DO, 24Vac
E--- HEAT
24Vac
Type of I/O
Connection Pin Number
24Vac
24Vac
Type of I/O
Connection Pin Number
Unit Connection
P2--- 3
LCTB--- G
P2--- 5
LCTB--- Y1
P2--- 4
LCTB--- Y2
P2--- 7
LCTB--- W1
P2--- 6
LCTB--- W2
P3--- 1
CONTL BRD--- 8
P3--- 2
CONTL BRD--- 4
Unit Connection
P3--- 9
REHEAT--- 2
OF
P3--- 10
FPT --- REHEAT--- 6
P3--- 8
REHEAT--- 8
HC --- 1 (TB4--- 1)
P3--- 3
HC --- 1 (TB4--- 3)
Unit Connection
P1--- 1
P1--- 3
Unit Connection
JMP17
JMP18
Compressor control — The DFB receives inputs
indicating Stage 1 Cooling, Stage 2 Cooling (sizes 08 - -
12) and Stage 1 Heating from the space thermostat or unit
control system (PremierLink or RTU- - OPEN); it
generates commands to start compressors with or without
reversing valve operation to produce Stage 1 Cooling (one
compressor), Stage 2 Cooling (both compressors run) or
Stage 1 Heating (both compressors run on 8- - 12 systems.
The 04- - 07 systems have only one compressor).
24
Note
Note
OFR
Energize in COOL
Energize in COOL
Note
Use for 50HCQD
Note
C09276

Advertisement

Table of Contents
loading

This manual is also suitable for:

50hcqa0450hcqd0850hcqa0650hcqd0950hcqd1250hcqa07

Table of Contents