Bp Unit; Removal Of Pcb Assembly - Daikin RMKS112EV1A Service Manual

Removal procedure
Hide thumbs Also See for RMKS112EV1A:
Table of Contents

Advertisement

Si181180

2. BP Unit

2.1

Removal of PCB Assembly

Procedure
Step
Remove the 4 screws
1
and remove the
electrical box cover.
2
The PCB is as shown at
the right. Disconnect all
the relay cables.
Removal Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Points
(Q0501)
The PCB is waterproof with
resin. This means that the
fuse and varistor cannot be
replaced.
When reassembling, have
test operation for checking
wrong wiring.
(Q0502)
(R12987)
BP Unit
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents