1. Prepare the Site

NOTICE: Adequate floor support must be provided. Consult the roughing-in sheet packed with your bath
for specific floor loading requirements.
Make sure the flooring offers adequate support for your bath, and verify that the subfloor is flat and
level.
This bath must be installed in a corner.
When constructing the framing, allow for the thickness of the finished wall materials.
Construct 2x4 or 2x6 stud framing according to the roughing-in information packed with the bath.
Position the plumbing according to the roughing-in information. Cap the supplies and check for
leaks.
Unless the bath is elevated for an above-floor drain installation, a hole will need to be cut to
accommodate the drain connections. Refer to the roughing-in information.
2. Install the Receptor (if used)
If this installation requires a receptor, install it now according to the instructions packed with the
receptor.
3. Prepare the Bath
Install the drain to the bath according to the drain manufacturer's instructions. Do not connect the
trap at this time.
Position a clean drop cloth or similar material in the bottom of the bath. Be careful not to scratch the
surface of the bath.
Kohler Co.
Construct 2x4
or 2x6 stud
framing
according to
the roughing-in
information
Verify that the subfloor offers
adequate support, and is flat and level
Position
the rough
plumbing
3
1023717-2-B