Mounting The Channel Base And Rack Console - Furuno RC-1800F2 Series Installation Manual

Gmdss radio station
Hide thumbs Also See for RC-1800F2 Series:
Table of Contents

Advertisement

1.2

Mounting the Channel Base and Rack Console

Leave at least 100 mm of service space on the sides and at the rear of the console. Determine
cable coming position and size and ground location by referring to the figure below. Determine
size of the cable coming considering both cable size and cable bends.
Weld all sides of the channel base to the deck. Fasten the rack console to the channel base with
six M12 bolts.
After leading in cables through the rear of the rack console, cover cable entrances with putty or
silicone sealant to close any gaps.
If necessary cables can
be led in through the
rear of the channel
base.
Service Space
100 mm
Note: After welding and painting
with rust inhibiting paint, paint
same color as console
(Munsell 7.5BG7/2).
Note: After removing four hoisting eyebolts from the rack console, cover the four holes for the eye-
bolts with the cosmetic caps (installation materials: CP05-09301).
CAUTION
Ground the equipment to
prevent electrical shock and
mutual interference.
Handle copper plate carefully.
An edge of it may harm your
hand.
RC-1800F2
Fixing Hole
(φ15, 6 places)
Hex Bolt
(M12, 6 pcs., local supply)
Note: Cable entrance at bottom of console. Determine
the cable coming location considering frame position,
cable layout and total sectional area of cabling.
Remove eyebolts and
cover with four cosmetic caps.
Rear cable entrance
67x200 mm, 2 places
Cable Entrance 465x422 mm
Copper Plate Support
Steel plate with
copper plate 0.4x50x600 mm
(Installation Materials: CP05-09301)
Service Space
100 mm
Service Space
100 mm
1-3