Mounting; Mounting Considerations - Furuno RC-1800F2 Series Installation Manual

Gmdss radio station
Hide thumbs Also See for RC-1800F2 Series:
Table of Contents

Advertisement

1. MOUNTING

1.1

Mounting Considerations

1.1.1
Mounting considerations for RC-1800F2
As shown on the next page, the rack console is normally installed on the bridge.
Install the rack console where the equipment can be easily operated, checked and serviced. Con-
sult with shipyard personnel and ship's officer-in-charge to determine best location. The location
must satisfy the following points:
• Consider relation to other equipment near mounting site and mounting direction.
• Select a location where controls can be easily operated.
• Ample space should be left at the sides of the equipment to enable servicing and to provide
ventilation.
• Select a location where shock and vibration are minimal.
• Locate the console away from water splash and rain.
• The temperature and humidity of the location should be both stable and moderate.
• If the rack console is to be installed in the radio room, the units shown below must be installed
on the bridge.
Distress Alert/Received Call Unit IC-305
Alarm Unit IC-306
SSAS Alert Unit IC-307
Control Unit FS-2571C/2575C
EGC Printer PP-505
• The performance of a magnetic compass will be affected if placed too close to the rack con-
sole. Separate the rack console from a compass by the distances shown on page i to prevent
compass error.
As for mounting the antenna coupler and antenna units, refer to the respective Installation Manu-
als.
1-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents