Siemens SITRANS LG270 Operating Instructions Manual page 20

Guided wave radar 4...20 ma/hart - our-wire rod and cable probe -196...+280 c; -196...+450 c
Table of Contents

Advertisement

20
3
A
2
Fig. 10: Mounting in a standpipe
1
Holes (for mixing)
2
Standpipe - vertically mounted - max. deviation 10 mm (0.4 in)
3
Ventilation opening
A Rod probe with spacer (steel)
B Cable probe with centering weight
Note:
Measurement in a standpipe is not recommended for extremely adhe-
sive products. In case of slight buildup, you should choose a bypass
tube with bigger diameter.
Instructions for the measurement:
The 100 % point with standpipes should be below the upper
ventilation hole.
The 0 % point in standpipes should be above the gravity or center-
ing weight.
SITRANS LG270 - Operating Instructions
ø 150 - 200 mm
(5.91 - 7.87")
1
ø 150 - 200 mm
(5.91 - 7.87")
B
PBD-51041064

Advertisement

Table of Contents
loading

Table of Contents