Set-up and Initial Start-up

Check the machine for transport damage after unpacking it. Please notify the carrier and the
relevant PFAFF agency in the event of any damage.
8

Set-up

.01
Suitable electrical supply connections must be provided at the erection site, see chapter 3
Technical Data. The erection site must also have a fi rm and level subsurface and adequate
lighting.
8

Setting the table height

.01.01
(PFAFF 3586-22/02, -23/01, -23/02)
1
Fig. 8 - 01
 Loosen the screws 1 and set the desired table height.
 Tighten the screws 1 with 50 Nm.
The machine may only be set up and started up by qualifi ed personnel! All of
the relevant safety regulations must always be complied with in this process!
The table top is lowered for packaging purposes.
The adjustment of the table height is described below.
1
The alignment on the lower frame tubes can be checked with a spirit level.
Set-up and Initial Start-up
(PFAFF 3586-24/02, -25/..)
1
1
1
Fig. 8 - 01 a
1
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

3586-22/023586-23/023586-24/023586-23/01

Table of Contents