Cisco UCS 6332 Hardware Installation Manual page 73

Fabric interconnect
Table of Contents

Advertisement

Site Planning and Maintenance Records
Site Preparation Checklist
Planning the location and layout of your equipment is essential for successful system operation, ventilation,
and accessibility.
Consider heat dissipation when sizing the air-conditioning requirements for an installation.
Table 19: Site Planning Checklist
Task No.
1
Site Preparation Checklist, on page 71
Contact and Site Information, on page 73
Chassis and Module Information, on page 74
Planning Activity
Space evaluation:
• Space and
layout
• Floor covering
• Impact and
vibration
• Lighting
• Maintenance
access
A P P E N D I X
Verified By
Cisco UCS 6300 Series Fabric Interconnect Hardware Installation Guide
C
Time
Date
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ucs 6300 seriesUcs 6332-16upUcs 3223-16up

Table of Contents