Mounting and Commissioning
This chapter is intended for experienced commissioning staff. They should be familiar with the commissioning
of protection and control equipment, with operation of the power system network and with the safety rules
and regulations. Certain adaptations of the hardware to the power system specifications may be necessary.
For primary testing, the object to be protected (generator, motor, transformer) must be started up and in put
into service.