Samsung ERV Operating Instructions Manual page 40

Energy recovery ventilator
Table of Contents

Advertisement

No
Parts
6
Cushion Mid
Samsung Electronics
Procedure
1) As seen in the picture besides, pull out
the EPS structure located at the center of
exhaust air and supply air.
2) Pull out the EPS structure through the
inspection hole.
3) Assemble the product by adjusting it
with the direction, following the direction
carved on the surface of Cushion Mid. Put
the part written with "Down↓" downwards
and put the part with "Motor→" towards
the Motor when assembling the unit.
Make sure not to break down EPS
structure.
Remark
4-25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents