Water Supply/Extraction
Do not drill without water cooling! If the water
supply is interrupted for a significant period of
time, damage may result to the core bit or the
core bit may become jammed in the work piece.
Water Supply
Close the water shut-off valve 18. Connect the water
supply line to the tap connection piece 2. The supply-
ing of water is possible from a mobile pressurised wa-
ter container (optional accessory) or stationary water
connection.
Water Extraction
To collect the water that emerges from the drilling, use
a water collection ring (accessory) and an all-purpose
vacuum cleaner.
Place the water collection ring 11 together with the
holding device 9 in the support bracket 7 of the drill
stand. Tighten the ring screws 8 far enough so that
the water collection ring is positioned close to the wall.
Connect the hose of the all-purpose vacuum cleaner
to the connection piece 12 of the water collection ring.
When changing the drilling angle or drilling with a
smaller diameter, insert a new sealing cover 13 into the
water collection ring.
The water collection ring 11 can be rotated in the hold-
er to place the extraction connection piece 12 in an
optimum position.
clamping lever 10, rotate the water collection ring in
the clamping band to the desired position and close
the clamping lever 10 again.

Putting into Operation

Ensure that the mains voltage is correct!
The voltage of the power source must agree with the
value given on the nameplate of the machine. Ma-
chines designated for 230 V can also be operated with
220 V.
Use suitable detectors to find hidden utility
s
lines or call the local utility company for as-
sistance. Contact with electric lines can lead to
fire or electrical shock. Damaging a gas line can re-
sult in an explosion. Penetrating a water pipe will
cause property damage or an electrical shock.
1 609 929 C90 • (02.07) T
For this purpose, loosen the
Before beginning work, consult the responsi-
s
ble structural engineer, architect or building
foreman concerning the planned drillings.
Drill through reinforcements only with the
permission of the structural engineer.
When drilling through walls and floors, check
s
the rooms concerned for obstacles and block
off the work area. Secure against falling drill-
ing cores with planking.
Function Test of the FI Protection Switch
Before beginning work, check the proper functioning
of the FI protection switch 3.
Press the "RESET" button on the FI protection
switch.
The operational readiness of the protective switch
is signalled by a red control indicator.
Press the "TEST" button.
The indicator over the "RESET" button goes black.
Switching On/Off
Switching on:
Press the "RESET" button on the FI protection switch 3.
Set the water shut-off valve 18 for flow-through.
Check with the flow-through indicator 17.
Starting the drilling with half speed:
Turn the on/off switch 20 to the 1/2 position. The
switch does not have a detent in this position.
Drilling:
Turn the on/off switch 20 to the I position.
Switching off:
Release the on/off switch 20 or turn the switch to the
0 position. Close the water shut-off valve 18.
After finishing the work, disconnect the tap connection
piece 2 from the water supply and drain the remaining
water by opening the water shut-off valve 18.
Setting the Speed
With the gear selector 4, two speed ranges can be se-
lected.
82–212 mm
English–3
Drill diameter
32–132 mm