CME1356R and CME1656R
Bin Control: Installation
The bin control is a thermostat. It must be field
installed after the ice machine has been placed on
the bin.
Before starting, remove the left front panel and any
baffle in the bin.
1. Locate bin thermostat bulb.
2. Route bulb thru routing tube (located between
the compressor and the reservoir).
3. Locate bin thermostat bracket.
4. Carefully position the thermostat bulb on the
bracket (see the diagram on the next page).
5. Fasten the bracket to the bottom of the ice
machine with the two 3-pronged knobs supplied
with the unit.
6. Pull back into the ice machine any excess
capillary tubing.
7. Return the baffle to the bin and continue with
the installation.
Bin
Thermostat
Body
Thermostat Bulb
Routing Tube
Note: If the machine is located at an altitude higher
than 2,000 ft., adjust the thermostat by removing
the plastic cover and rotating the adjustment screw
per the table.
Feet
2000
4000
6000
Bin Thermostat Bulb
Route Bin Thermostat Bulb Into Bin
May 2001
Page 6
Thermostat Bulb Routing Tube
Bin Thermostat Altitude Correction Table
CW Turns of Range Screw (under plastic cover)
Turns
o
55
o
160
o
250
Use This Table to Adjust Thermostat
Feet
Turns
o
8000
340
o
9000
385
o
10000
405