Mira Zest 7.5 Installation, Operation And Maintenance Manual page 24

Electric showers 7.5 and 8.5 kw
Table of Contents

Advertisement

Inlet Connector
Thermal Switch - Removal and Installation
WARNING! Isolate the electrical and water supplies before removing the cover. Mains
electricity connections are exposed when the cover is removed.
1.
Remove the three cover retaining screws, the cover and the service tunnel.
2.
Remove the hose from the outlet connector and loosen the connection to the inlet
connector assembly.
3.
To improve access to the top terminals of the tankthe terminal block may be loosened
by removing the fixing screw.
4.
Remove the splash guard which is located between the heater tank and the
switching assembly.
5.
Remove the screws that hold the inlet clamp bracket in position and remove the
clamp bracket.
6.
Remove the screws that hold the flow valve and switching assembly and the heater
tank in position.
24
Terminal
Block
Microswitch
Clamp Bracket
Clamp Bracket
Retaining Screws
Heater Tank - Removal Installation
Heater
Tank
Switching
Assembly
Flow Valve
Assembly
Thermal Switch
Heater Tank and
Flow Valve
Retaining Screws

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zest 8.5

Table of Contents