Mira Zest 7.5 Installation, Operation And Maintenance Manual page 14

Electric showers 7.5 and 8.5 kw
Table of Contents

Advertisement

15. Re-tighten the terminal block screws.
16. If necessary, fit an earth bonding clamp to the copper supply pipe and ensure
bonding complies with relevant regulations in force at the time of installation.
17. Refit the cover. Fit the three cover retaining screws and tighten.
Electrical Supply
Cable
Inlet Connector
(The inlet
connector can be
swivelled to suit the
supply)
Cold Water
Supply Pipe
14
Terminal Block
Installation of the Mira Zest
Cover Retaining
Screw
Service Tunnel
Splash Guard
(Make sure that it
is secured before
operating the
shower)
Fixing Screw
Do not fit the Mira
Zest to the wall and
tile up to the case.
The Mira Zest must
be fitted onto a
finished flat and even
wall surface (small
pillars moulded onto
the back of the case
to allow for air
circulation)
Outlet Connector