ABB CalMaster2 Instruction Manual page 51

Tests the integrity of a flow metering system by altering a number of flow measurement parameters and measuring the values returned from the flow measuring system.
Hide thumbs Also See for CalMaster2:
Table of Contents

Advertisement

Products
Automation Systems
for the following industries:
Chemical & Pharmaceutical
Food & Beverage
Manufacturing
Metals and Minerals
Oil, Gas & Petrochemical
Pulp and Paper
Drives and Motors
AC and DC Drives, AC and DC Machines, AC
Motors to 1kV
Drive Systems
Force Measurement
Servo Drives
Controllers & Recorders
Single and Multi-loop Controllers
Circular Chart and Strip Chart Recorders
Paperless Recorders
Process Indicators
Flexible Automation
Industrial Robots and Robot Systems
Flow Measurement
Electromagnetic Flowmeters
Mass Flowmeters
Turbine Flowmeters
Wedge Flow Elements
Marine Systems & Turbochargers
Electrical Systems
Marine Equipment
Offshore Retrofit and Refurbishment
Process Analytics
Process Gas Analysis
Systems Integration
Transmitters
Pressure
Temperature
Level
Interface Modules
Valves, Actuators and Positioners
Control Valves
Actuators
Positioners
Water, Gas & Industrial Analytics
Instrumentation
pH, Conductivity and Dissolved Oxygen
Transmitters and Sensors
Ammonia, Nitrate, Phosphate, Silica, Sodium,
Chloride, Fluoride, Dissolved Oxygen and
Hydrazine Analyzers
Zirconia Oxygen Analyzers, Katharometers,
Hydrogen Purity and Purge-gas Monitors,
Thermal Conductivity
PRODUCTS & CUSTOMER SUPPORT
Customer Support
We provide a comprehensive after sales service via a
Worldwide Service Organization. Contact one of the
following offices for details on your nearest Service and
Repair Centre.
United Kingdom
ABB Limited
Tel: +44 (0)1453 826661
Fax: +44 (0)1453 829671
United States of America
ABB Inc.
Tel: +1 215 674 6000
Fax: +1 215 674 7183
Client Warranty
Prior to installation, the equipment referred to in
this manual must be stored in a clean, dry
environment, in accordance with the Company's
published specification.
Periodic
checks
must
equipment's condition. In the event of a failure
under warranty, the following documentation must
be provided as substantiation:
1.
A listing evidencing process operation
and alarm logs at time of failure.
2.
Copies of all storage, installation,
operating and maintenance records
relating to the alleged faulty unit.
be
made
on
the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Checkmaster

Table of Contents