Preliminary Checks; Check Equipment Received; Moving And Siting The Unit - Carrier AquaForce 30XB series Installation, Operation And Maintenance Instructions

Air-cooled screw chillers
Table of Contents

Advertisement

2 - PRELIMINARY CHECKS

2.1 - Check equipment received

Check that the unit has not been damaged during transport
and that no parts are missing. If the unit has been damaged
or the shipment is incomplete, send a claim to the shipping
company.
Compare the name plate data with the order. The name plate is
attached in two places to the unit:
On one of the unit sides on the outside,
-
On the control box door on the inside.
-
The unit name plate must include the following information:
Version number
-
Model number
-
CE marking
-
Serial number
-
Year of manufacture and test date
-
Fluid being transported
-
Refrigerant used and refrigerant class
-
Refrigerant charge per circuit
-
Containment fluid to be used
-
PS: Min./max. allowable pressure (high and low pressure
-
side)
TS: Min./max. allowable temperature (high and low
-
pressure side)
Pressure switch cut-out pressure
-
Unit leak test pressure
-
Voltage, frequency, number of phases
-
Maximum current drawn
-
Maximum power input
-
Unit net weight
-
Confirm that all accessories ordered for on-site installation have
been supplied, are complete and undamaged.
The unit must be checked periodically during its whole
operating life to ensure that no shocks (handling accessories,
tools etc.) have damaged it. If necessary, damaged parts must
be repaired or replaced. See also chapter 13 - "Standard
maintenance".
8

2.2 - Moving and siting the unit

2.2.1 - Moving
See chapter 1.1 "Installation safety considerations".
In some cases vertical supports are added for the transport and
handling of the unit. These supports can be removed for access
or connection, if required.
IMPORTANT: Follow the disassembly sequence shown in the
disassembly instruction notes.
NOTE:
Screw off item: 1
-
Loosen screw item: 2
-
Raise and remove frame post item: 3
-
Screw off item: 4 and remove reinforcement plate
-
item: 5
Keep the vertical supports after commissioning the units and re-
insert them when the unit is moved.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquaforce 30xbp series

Table of Contents