3.4

ELECTRICAL WIRING

All the installation, maintenance and disassembly operations must be carried out with the electricity sup-
ply disconnected.
WARNING
The burner requires periodic maintenance carried out by a qualified and authorised technician in con-
formity with legislation and local standards.
DANGER
ATTENTION:
Do not swap neutral and phase over, follow the diagram shown carefully and carry out a good earth connection.
The section of the conductors must be at least 1mm². (Unless requested otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in compliance with the rules in force in the country.
Verify that the burner stops by operating the boiler control thermostats and that the burner locks out by separating the
red ionisation probe lead connector.
NOTES
The burners have been type-approved for intermittent operation. This means they must stop at least once every 24 hours in
order to allow the electrical control box to check its efficiency on start-up. The boiler limit thermostat (TL) normally ensures the
burner halts. If this does not happen a time switch halting the burner at least once every 24 hours must be applied in series to
limit thermostat (TL).

STANDARD ELECTRICAL WIRING

3.4.1 ELECTRICAL WIRING WITH GAS LEAK CONTROL DEVICE (DUNGS VPS 504)
KEY TO LAY-OUT
X6 – 6 pin plug
X7 – 7 pin plug
B4 – Working signal
h1 – Hour counter
PG – Minimum gas pressure
switch
S3 – Remote lock-out signal
(230V - 0.5 A max.)
T6A – Fuse
TL – Limit thermostat
TS – Safety thermostat
V10 – Safety valve
V11 – Adjustment valve
4.

WORKING

4.1 COMBUSTION ADJUSTMENT

In conformity with Efficiency Directive 92/42/EEC the application
of the burner on the boiler, adjustment and testing must be car-
ried out observing the instruction manual of the boiler, including
verification of the CO and CO
their temperatures and the average temperature of the water in
the boiler.
To suit the required appliance output, choose the proper set-
ting of the combustion head, and the air damper opening.
(see page 13).
TO BE DONE BY
THE INSTALLER
D4199
concentration in the flue gases,
2
C
A
B
GB
5
~
230V
50Hz
S7015
20039281

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents