Formula To Calculate The Expansion Vessel Pre-Pressure - Daikin EBLQ011CA3V3 Installer's Reference Manual

Hide thumbs Also See for EBLQ011CA3V3:
Table of Contents

Advertisement

6 Preparation
▪ Piping diameter. Select the water piping diameter in relation to
the required water flow and the available external static pressure
of the pump. See
"14 Technical data" on page 79
static pressure curves of the outdoor unit.
▪ Water flow. It is required to guarantee a minimum flow of 20 l/min.
When the flow is lower, the system will stop operation and display
error 7H.
▪ Field supply components – Water and glycol. Only use
materials that are compatible with the water (and, if applicable,
glycol) used in the system, and with the materials used in the
outdoor unit.
▪ Field supply components – Water pressure and temperature.
Check that all components in the field piping can withstand the
water pressure and water temperature.
▪ Water pressure. The maximum water pressure is 3 bar. Provide
adequate safeguards in the water circuit to ensure that the
maximum pressure is NOT exceeded.
▪ Water temperature. All installed piping and piping accessories
(valve,
connections,...)
MUST
temperatures:
INFORMATION
The following illustration is an example and might NOT
match your system layout.
65°C
a
b
e
c
d
d
a
Outdoor unit
b
Heat exchanger
c
Pump
d
Shut‑off valve
e
Backup heater
f
Motorised 3‑way valve (supplied with the domestic hot
water tank)
g
Motorised 2‑way valve (field supply)
h
Collector
i
Domestic hot water tank
j
Heat exchanger coil
k
Booster heater
FCU1...3
Fan coil unit (optional) (field supply)
FHL1...3
Floor heating loop (field supply)
▪ Drainage – Low points. Provide drain taps at all low points of the
system in order to allow complete drainage of the water circuit.
▪ Drainage – Pressure relief valve. Provide a proper drain for the
pressure relief valve to avoid water coming into contact with
electrical parts.
▪ Air vents. Provide air vents at all high points of the system, which
must also be easily accessible for servicing. The outdoor unit has
a manual air purge valve. The backup heater (option) has an
Installer reference guide
24
for the external
withstand
the
following
h
h
g
f
FCU1
FCU2
FCU3
h
M
M
h
FHL1
FHL2
k
j
FHL3
89°C
i
automatic air purge valve. Check that automatic air purge valves
are NOT tightened too much, so that the automatic release of air
from the water circuit is possible.
▪ Zn-coated parts. Never use Zn-coated parts in the water circuit.
Because the unit's internal water circuit uses copper piping,
excessive corrosion may occur.
▪ Non-brass metallic piping. When using non-brass metallic
piping, insulate the brass and non-brass properly so that they do
NOT make contact with each other. This to prevent galvanic
corrosion.
▪ Valve – Separating circuits. When using a 3-way valve in the
water circuit make sure that the domestic hot water circuit and the
floor heating circuit is fully separated.
▪ Valve – Change‑over time. When using a 2-way valve or a 3-way
valve in the water circuit, the maximum change-over time of the
valve must be 60 seconds.
▪ Filter. It is strongly recommended to install an additional filter on
the heating water circuit. Especially to remove metallic particles
from foul heating piping, it is recommended to use a magnetic or
cyclone filter, which can remove small particles. Small particles
may damage the unit and will NOT be removed by the standard
filter of the heat pump system.
▪ Domestic hot water tank – Capacity. To avoid stagnation of
water, it is important that the storage capacity of the domestic hot
water tank meets the daily consumption of domestic hot water.
▪ Domestic hot water tank – After installation. Immediately after
installation, the domestic hot water tank must be flushed with fresh
water. This procedure must be repeated at least once a day the
first 5 consecutive days after installation.
▪ Domestic hot water tank – Standstills. In cases where during
longer periods of time there is no consumption of hot water, the
equipment MUST be flushed with fresh water before usage.
▪ Domestic hot water tank – Disinfection. For the disinfection
function of the domestic hot water tank, see
water control: advanced" on
page 57.
▪ Thermostatic mixing valves. In accordance with the applicable
legislation, it may be necessary to install thermostatic mixing
valves.
▪ Hygienic measures. The installation must be in compliance with
the applicable legislation and may require additional hygienic
installation measures.
▪ Recirculation
pump.
In
legislation, it may be required to connect a recirculation pump in
between the hot water end point and the recirculation connection
of the domestic hot water tank.
c
a
b
d
a
Recirculation connection
b
Hot water connection
c
Shower
d
Recirculation pump
6.3.2
Formula to calculate the expansion vessel
pre-pressure
The pre-pressure (Pg) of the vessel depends on the installation
height difference (H):
Pg=0.3+(H/10) (bar)
EBLQ+EDLQ011~016CA3V3+W1 + EK(2)CB07CAV3
Daikin Altherma low temperature monobloc
"8.3.2  Domestic hot
accordance
with
the
applicable
4P538847-1 – 2018.05

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents