Figure 6 Wall Mounting Instructions; Figure 7 Wall Mounting Instructions - Bard WA4822 Installation Instructions Manual

Bard mfg. co. mounted package air conditioners models wa4822 wa4823 wa6022 wa6023 wa602n installation instructions
Table of Contents

Advertisement

SEE FIGURE 3 – MOUNTING INSTRUCTIONS
SUPPLY AIR
OPENING
RETURN AIR
OPENING
MIS-549
FIGURE 6
WALL MOUNTING INSTRUCTIONS
FIGURE 7
WALL MOUNTING INSTRUCTIONS
FRAMING MATERIAL
2 X 4'S, 2 X 6'S AND/OR
STRUCTURAL STEEL
SUPPLY AIR
OPENING
RETURN AIR
OPENING
BOTTOM MOUNTING
BRACKET. MOUNT ON WALL
BEFORE INSTALLING UNIT.
ATTACH TO TOP
PLATE OF WALL
1.000" CLEARANCE
ALL AROUND
INTERIOR FINISHED WALL
OVER FRAME
1.000" CLEARANCE
ALL AROUND
EXTERIOR FINISHED WALL
OVER FRAME
ATTACH TO BOTTOM
PLATE OF WALL
WALL STRUCTURE
FACTORY SUPPLIED RAIN
FLASHING. MOUNT ON UNIT
BEFORE INSTALLATION
SUPPLY AIR
OPENING
RETURN AIR
OPENING
MIS-548
SEE UNIT DIMENSIONS, FIGURE
1, FOR ACTUAL DIMENSIONS
SUPPLY DUCT
OPENING
RETURN DUCT
OPENING
THIS STRUCTURAL MEMBER LOCATED TO MATCH
STUD SPACING FOR REST OF WALL. A SECOND
MEMBER MAY BE REQUIRED FOR SOME WALLS.
Manual 2100-348
Page
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wa4823Wa6022Wa6023Wa602n

Table of Contents

Save PDF