Re-Installation; Indoor Unit - Carrier 42QHP09E8S Service Manual

Oasis plus 3d inverter series
Hide thumbs Also See for 42QHP09E8S:
Table of Contents

Advertisement

1.3

Re-Installation

1.3.1

Indoor Unit

Collecting the refrigerant into the outdoor unit
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the charge hose with the push pin of Handle
Lo to the 3-way valve's gas service port.
3.
Open the Handle Lo manifold valve to purge air
from the charge hose for 5 seconds and then close it
quickly.
4.
Close the 2-way valve.
5.
Operate the air conditioner in cooling mode. Cease
operations when the gauge reaches 0.1 MPa
(14.5 Psi).
6.
Close the 3-way valve so that the gauge rests
between 0.3 MPa (43.5 Psi) and 0.5 MPa (72.5 Psi).
7.
Disconnect the charge set and mount the caps of
service port and 2- and 3-way valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18N.m.
9.
Check for gas leakage.
Page 23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

38qhp09e8s42qhp12e8s38qhp12e8s

Table of Contents