Service Record Log Book; Function Testing; Table 21 - Worcester GB162-65 Installation And Servicing Instruction

Wall hung gas fired condensing boiler
Table of Contents

Advertisement

13.5 SERVICE RECORD LOG BOOK

Complete the log book while carrying out needs-oriented maintenance.
B Enter your signature and the date after completing the maintenance activities.
Needs-oriented maintenance
activities
1.
Cleaning the burner, heat
exchanger and condensate trap
after shutting down the heating
system.
2.
Checking and adjusting the
gas/air ratio:
• CO
content at full load
2
• CO
content at part load.
2
3.

Function testing.

4.
Confirming proper maintenance.

Table 21

6 720 648 726 (2011/07)
Date:
Date:
Page
________
________
64
52
_______ Pa
_______ Pa
_______ %
_______ %
_______ %
_______ %
68
Company
Company
stamp/
stamp/
signature/
signature/
date
date
MAINTENANCE
Date:
Date:
________
________
_______ Pa
_______ Pa
_______ %
_______ %
_______ %
_______ %
Company
Company
stamp/
stamp/
signature/
signature/
date
date
Date:
________
_______ Pa
_______ %
_______ %
Company
stamp/
signature/
date
69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gb162-80Gb162-100

Table of Contents