LG V-net PDRYCB000 Installation Manual page 11

Hide thumbs Also See for V-net PDRYCB000:
Table of Contents

Advertisement

6) Remove knock out shapes on the rear case (2-sided) according to the connector's size and
direction.
7) Connect the connection wires properly according to the connection. When connecting CN-POWER
and CN_DRY(L) to the power cable in the terminal block, make sure to put them inside the square
hole of the Clamp as shown in the picture.
8) Set the switch according to the setting method. (Refer to the instruction)
9) Combine top part of the metal case with the back side of the metal case.
10) Hang the front of the case to the rear case hook and tighten the fixing screws on the bottom part.
1. Install the product on flat surface and install anchoring screws at more than 2 places. Otherwise
the central controller may not be anchored properly.
2. Do not tighten anchoring screws too tightly. It may cause deformation of the case.
3. Do not deform the case at random. It may cause malfunction of the central controller.
Part Description
Installation Manual 11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents